Almost every aviary site slopes. Not dramatically, usually. A garden that falls away from the house, a paddock with a crown in the middle, a zoo plot on the side of a hill. Enough that the ground drops 400 mm across a 6 m footprint, which is more than any base detail wants to absorb.
The usual response is to follow the ground. Posts go in at different depths, the bottom rail climbs with the grade, and the whole building ends up standing on a ramp. Then the door stops closing in winter, water sits at the low corner, and someone spends a weekend trying to tension mesh against a frame that was never level.
The alternative is a level box on a site that is not level. That costs money at the groundworks and saves it at the mesh, because a level building has one floor and one datum.
Here is how that decision plays out on a real slope.
Executive Summary
A walk-in aviary needs a level floor and a level frame, and a sloping site offers neither. Build the box level and step the base against the ground instead of raking the frame to follow the grade.
That one decision sets everything downstream. The floor becomes a cut on the uphill side and fill on the downhill side, so it needs a retaining edge and a cutoff drain ahead of the mesh line. Each wall becomes a stack of panels of different heights rather than one panel stretched over the fall.
An aviary on a slope is not a harder job than one on flat ground. It is the same job with the levels fixed first and the mesh ordered against a datum.
Quick Answer
Build the aviary level and step the base, rather than raking the frame to follow the ground. A level floor gives you one datum, a door that closes and a predictable fall for water, while the slope gets absorbed in footings of different depths and a base rail that steps where the grade changes. Order the mesh against that datum, so each wall carries its own panel heights instead of one height stretched across a slope.
Key Takeaways
- A level floor and a level frame matter more than a level site.
- Step the base. Never rake the frame to follow the grade.
- Every step costs an edge cable, a termination and a place to check.
- Cut uphill, fill downhill, and hold the fill with a retaining edge.
- Water arrives from uphill. Intercept it before it reaches the mesh line.

The Floor Is Level. The Site Is Not.
Start with the one line that cannot move: the finished floor level. Birds need it flat for footing, dust bathing and feeding. Visitors need it flat for walking in. A floor tilting at 1 in 12 is not a floor, it is a slope with gravel on it.
Fix that line and the site has to be dealt with above and below it. Uphill, the ground gets cut away. Downhill, it gets built up. A sloping aviary site ends up with the building standing in a shallow terrace, and the terrace edges belong to the building even when a landscaper builds them.
The aviary mesh we weave closes the envelope above that floor and it does not care what the ground does underneath. The frame cares a great deal. Every post on the downhill side runs longer, every footing uphill runs shallower, and the base rail changes elevation somewhere along each wall.
What a Slope Actually Does to the Mesh
Put a number on the fall before ordering anything. A 6 m wide aviary on a 1 in 12 grade has 500 mm of level difference across the width. On a 1 in 8 grade it has 750 mm. That figure decides how many steps the base needs.
| Fall across 6 m | Level difference | Base steps | Panels per side wall |
| 1 in 40 | 150 mm | none | 1 |
| 1 in 20 | 300 mm | 1 | 2 |
| 1 in 12 | 500 mm | 2 | 3 |
| 1 in 8 | 750 mm | 2 to 3 | 3 |
| 1 in 6 | 1000 mm | 3 | 4 |
Read the aviary ground slope off a level, never off the eye. A lawn that looks flat routinely hides 200 mm, and that is the difference between one panel and two.
Each step is a horizontal break in the base rail. The mesh above it becomes a separate panel with its own edge cable top and bottom, because a tensioned stainless steel rope mesh cannot follow a step and keep its tensile strength. So the aviary panel heights vary by wall, and the uphill wall is shorter than the downhill wall by exactly the fall across the building.
One building on a slope is not one mesh order. It is four walls, each with its own height.
Cutting and Filling the Floor
A level floor on sloping ground means earth moves. Call it aviary cut and fill: material comes out of the uphill side and goes into the downhill side, and the volume roughly balances if the terrace sits at the mid-level of the fall.
The existing structure survey logic applies here too. Read the ground before you set the frame out, because the terrace you design decides the footing depth on every post.
Two rules keep the terrace honest.
- Cut, do not fill, under the loaded posts. A post standing on 600 mm of loose fill settles, and a settled post takes the tension out of the panel above it.
- Step the retaining edge rather than sloping it. A battered edge looks softer and moves further.
On a shallow fall, 300 mm or less, the terrace is a strip footing and the base rail can sit on a low upstand. On a steep one, the downhill edge needs a real aviary retaining wall, and that wall becomes the datum everything else is measured from.
The aviary footing depth follows the same logic. Uphill footings sit in cut ground and can be shallow. Downhill footings sit in fill or in undisturbed ground below the terrace, and they run deeper. Same post, same load, two different depths, and the drawing has to show both.
Husbandry settles the rest. IUCN species conservation guidance treats enclosure conditions as part of managing a population well, and a terrace that ponds at the low corner fails that test long before it fails an inspection.

The Base Steps, and Every Step Is a Detail
Where the grade crosses a threshold, the aviary base rail stops and restarts 300 mm higher or lower. That is an aviary stepped base, and it is where a sloping site shows up in the mesh.
Three things happen at each step.
- The panel above the lower run terminates on an edge cable, and so does the panel above the upper run. Two terminations instead of one continuous edge.
- A short vertical member closes the gap between the two levels. That member is the only part of the wall carrying load in two directions at once, so it needs to be a post rather than a rail.
- The base rail ends land on that vertical member from both sides, which makes the aviary corner post and every intermediate step post the same detail.
The aviary failure cases we get called about cluster at these junctions, and almost all of them trace back to one shared fixing taking two loads.
Keep the walk-in aviary base continuous in one plane wherever you can. A base rail that runs level for 6 m and then steps once is far easier to tension than one that steps four times over the same distance. Fewer steps means fewer edge cables, fewer turnbuckles and fewer places for a gap to open.
Grade matters at ground level as well. The soil line is the one place where corrosion resistance earns its keep, because a rail sitting in wet ground holds moisture against the wire and starves it of oxygen. Hold the lowest rail 50 mm clear of the soil, or set it on a concrete upstand.
Water Arrives From Uphill
A terrace cut into a slope is a sump unless you deal with the water before it gets there. Rain landing uphill of the aviary travels down the slope, meets the cut face and stops.
That is what an aviary cutoff drain is for. A shallow trench with a perforated pipe and a gravel surround, set two or three meters uphill of the mesh line, catches the water and takes it around the building rather than under it.
Put it uphill of the footings, not between the footings. A drain inside the terrace collects water that has already arrived.
The floor then handles what falls inside the footprint. Give it a fall of about 1 in 100 to a low point, and keep that low point outside the mesh line. The aviary drainage detail matters more here than on flat ground, because a cut terrace has nowhere to shed water except the corner you choose.
The Door Lands at the Low End
An aviary on a slope has one door, and it lands at the low end, because that is where the path arrives and where the floor meets grade.
That makes the aviary door threshold the most detailed 900 mm in the building. The floor is level inside, the ground is falling outside, and the two have to meet without a step up that trips visitors or a gap under the leaf that lets a bird out.
Three ways to resolve it.
- Ramp outside, level inside. The simplest and the one to choose whenever the fall allows a ramp under 1 in 12.
- One step down outside, with the threshold sealed to the base rail. Works to about 200 mm of fall.
- A raised landing that returns to grade along the wall. Use it when the fall is steep and the path runs parallel to the building.
Whichever you pick, the door frame needs its own footing. It carries the leaf, the closer and the visitor, and it sits at the point where the base rail already steps. The walk-in aviary panels we supply arrive with the door leaf hung on its own frame for exactly this reason, so the threshold detail does not depend on the wall panel above it.
What to Put on the Drawing
Most of the cost of an aviary on a slope is decided before anyone cuts steel. Six numbers on a drawing settle it.
- The aviary floor level, as a single figure tied to a site datum.
- The four corner ground levels, surveyed rather than estimated.
- The fall across each wall, which sets the number of steps.
- The position and elevation of every step in the base rail.
- The footing depth at each corner, split between cut and fill.
- The invert level of the cutoff drain, so it discharges below the terrace.
Add the clear height you want and the mesh aperture, and a factory can schedule the panels without a site visit. Leave the levels off and someone will order one height for four walls, then discover the problem when a hand-woven panel will not tension.
The aviary commissioning sequence covers what happens after the panels arrive, including how much a new panel moves in its first season and when to take up the slack.
One last thing belongs on the drawing too: the aviary datum line, marked on a post that stays. A sloping site generates a dozen local levels during construction, and the only defense against drift is one mark everyone measures from.
FAQ
Yes, and most sites slope to some degree. Build the aviary level and absorb the fall in the groundworks rather than in the frame. The building stays square, the door keeps closing, and the mesh stays in tension.
Roughly 150 mm across the width. Below that a single panel spans the wall and the base rail runs level on a shallow upstand. Above it, the level difference starts showing up as slack at one end of the panel, and a step in the base rail is the cheaper fix.
It changes the quantity and the panel count, not the specification. Each wall gets its own panel height, so a building that would have been four panels becomes six or eight. The aperture, wire rope diameter and finish stay the same throughout.
At the low end, where the floor meets grade, with a ramp or a single step outside. Putting the door at the high end means cutting into the slope for the path, and a path in cut ground drains toward the threshold all winter.
Only where the terrace needs to hold fill. Under about 300 mm of level difference a strip footing does the job. Beyond that the downhill edge needs a wall, and that wall becomes the line the base rail and the mesh are set out from.