A netting order rarely goes wrong in the workshop. It goes wrong at the port.
The mesh is woven to the right aperture, the panels pass inspection, the crates are strapped. Then the container sits at destination because nobody filed the import entry, or the buyer learns that the freight was paid to the port but not from it.
Every one of those problems traces back to a line on the purchase order that most buyers skim. The shipping term.
Custom netting order shipping terms decide who books the vessel, who pays which leg, who insures the cargo, who clears customs and where risk changes hands. Get them wrong and the cheapest quote becomes the most expensive delivery.
This guide covers the four terms that fit most mesh orders, the trap inside CIF, what freight actually costs on a bulky product, and what belongs on the order sheet.
Executive Summary
Shipping terms split a netting order into two questions: who pays for each leg, and where risk passes from seller to buyer. Those answers are not always the same point, and the gap between them causes most disputes.
FOB suits buyers who can clear customs and book freight. CIF moves the booking to the seller but leaves risk at the origin port. DDP puts everything on the seller and costs the most.
Choose by capability, not by price. A buyer with a customs broker and a freight forwarder should buy FOB. A first-time importer shipping to a zoo gate should price DDP and compare it against CIF plus a broker.
Quick Answer
FOB is the usual default for a custom netting order: the seller clears export and loads the vessel, and the buyer books freight, insures the cargo and clears import. CIF shifts the freight booking to the seller but keeps risk at the origin port, so the buyer still owns the cargo in transit. DDP puts freight, duty and delivery on the seller and suits buyers without an import process.
Key Takeaways
- Shipping terms answer two separate questions: who pays, and where risk moves.
- Under CIF the seller pays freight but risk passes when the cargo loads, not when it arrives.
- Mesh is bulky and light, so sea freight bills on volume rather than weight.
- A half-filled container costs the same as a full one under FCL.
- Untreated wood crates get refused or fumigated at the buyer’s expense under ISPM 15.
- The last mile from port to a zoo gate is the leg buyers forget to price.
- Put the named place, the Incoterms year and the unloading method on the PO.
Where Cost and Risk Split
Four terms cover most mesh orders. Each one moves a different set of costs to the seller, and each one moves risk at a different moment.
| Term | Seller pays | Risk passes | Buyer clears import | Fits |
| EXW | Nothing beyond packing | At the factory door | Yes | Buyers with their own forwarder at origin |
| FOB | Export clearance, inland haul, loading | When cargo is on board | Yes | Experienced importers |
| CIF | FOB plus ocean freight and insurance | When cargo is on board | Yes | Buyers who want one invoice for freight |
| DDP | Everything, including duty and delivery | At the named destination | No, the seller does | First orders, site deliveries |
Read the table down the risk column, not across the cost column. That column decides who argues with the insurer when a container goes overboard.
The risk transfer point incoterms set is not the same as the cost split, and that gap is where claims live. A container of stainless steel cable mesh panels is high value and low density, which makes it awkward freight and an expensive thing to lose.
The CIF Trap: Freight Paid, Risk Not Carried
CIF feels like door-to-door because the seller pays the ocean freight. It is not.
Under CIF the seller contracts carriage to the destination port and arranges insurance, but risk passes to the buyer when the goods load at origin. If the vessel is delayed, damaged or lost mid-voyage, the buyer owns the problem and claims on a policy the seller bought.
That policy has a floor, not a ceiling. CIF requires cover of at least 110 percent of the contract value on Institute Cargo Clauses C, the narrowest of the standard cover levels, and clauses C excludes a long list of perils that clauses A includes.
So the FOB vs CIF for mesh orders comparison is never like for like. One price includes freight you did not book, and the other includes nothing but the goods on board.
The terms themselves come from the ICC’s Incoterms 2020 rules, published by the International Chamber of Commerce. Read the rule for your chosen term before the PO, not after the first claim.
What Freight Actually Costs on Mesh
Wire rope mesh breaks the usual freight arithmetic. A cubic meter of packed mesh weighs far less than a cubic meter of steel plate, so carriers bill the space, not the mass.
The chargeable weight for netting rolls rarely matches the scale weight, because volume rules the calculation. Sea LCL charges per W/M, one cubic meter or one tonne, whichever is greater, and packed mesh almost always bills on the cubic meter.
FCL works differently. A 20 ft container holds roughly 33 m³, a 40 ft about 67 m³, and a 40 ft high cube around 76 m³. The box costs the same whether it is full or half empty, so container fill for mesh rolls becomes a pricing decision rather than a packing detail.
- Nest panels flat and strap them in bundles to reduce dead space.
- Ship rolls upright where the drum allows, because a squashed roll wastes height.
- Combine frames, fittings and mesh in one box when the schedule permits.
- Ask for the packed volume before you compare an LCL quote with an FCL quote.
The LCL or FCL for mesh panels decision follows that volume figure, not the order value. Air freight only makes sense for small urgent orders such as a repair panel, because it bills on chargeable weight at roughly 167 kg per cubic meter.
Documents That Stop a Shipment at the Port
Customs clearance for stainless mesh needs an HS code, a broker and an entry filed before the vessel berths. A stainless steel 304 order also needs a mill certificate that matches the alloy on the invoice. A shipment with perfect mesh and one missing document sits in a bonded warehouse at the buyer’s cost.
- Commercial invoice, matching the PO line for line.
- Packing list with crate numbers, dimensions and gross weights.
- Bill of lading for netting shipment, original or telex release as agreed.
- Certificate of origin where a trade agreement applies.
- Mill or test certificates for the wire and the ferrules.
- ISPM 15 mark on every piece of wood packaging.
That last item catches people. An ISPM 15 wood crate for mesh needs heat treatment or fumigation and a stamped IPPC mark, or the destination country refuses it and fumigates at your expense.
Cable diameter drives panel weight and crate rating, and edge cable, ferrules and fittings travel in the same crate. That is why the packing list matters as much as the invoice.
The export packing process matters here too, because crate design drives both damage rates and the volume you pay freight on.
Port to Site: The Last Mile
The container reaches the port, and the order is still not at the zoo. Port to site delivery netting is the leg that decides whether the mesh arrives on the day the crew needs it.
Drayage, unloading and site access all cost money, and none of them appear on a CIF quote. Mesh arrives long and heavy, so a 40 ft container of panels needs a forklift with long tines or a crane with a spreader.
Price the last mile before choosing terms:
- Distance from port to site, and any restricted-hours delivery window.
- Gate width, overhead clearance and turning space for a 40 ft trailer.
- Unloading equipment on site, or a liftgate surcharge.
- Secure storage, since mesh left on a path overnight invites damage.
Unloading a mesh container at site often costs more than the ocean freight on a small order. That single line explains why DDP quotes come back higher than buyers expect.
Where the site cannot take a full container, ask for a delivery plan before the order ships, and line it up with the installation sequence so panels arrive in the order the crew will hang them.
Choosing Terms for a Zoo Project
Match the term to what your organisation can actually do, not to the lowest number on the quote sheet. Ask who pays freight on netting order before you compare unit prices, because the answer changes the landed cost by more than the unit price does.
- First import, no broker: price DDP delivery for zoo mesh and accept the premium for certainty.
- Existing broker and forwarder: buy FOB and control the routing.
- Several suppliers: buy FOB and consolidate in one container.
- Warranty exposure: keep FOB so you hold the contract of carriage.
- Fixed public budget: DDP, because the landed cost is known before the PO.
The production calendar runs on a different clock from the shipment, and the lead time on an enclosure order starts at drawing approval rather than at the PO date. Build both timelines before you fix a delivery date.
Putting Terms on the Order Sheet
Write the term as a full sentence on the PO, with the named place and the Incoterms year. The named place on a netting contract is the detail that decides who pays for the last mile.
A complete entry looks like this: DDP, Zoo Name, 123 Service Road, delivered to the maintenance yard, Incoterms 2020, unloading by buyer with a 5 t forklift.
Add these to the same document:
- Named place, written as an address rather than a city.
- Incoterms year, since the 2010 and 2020 rules differ on some terms.
- Who insures, and at what cover level.
- Who clears import, and the broker’s details.
- Access constraints and unloading equipment at the site.
- Documents required before release of the bill of lading.
Panel sizes belong on that sheet too. The custom netting cut plan turns drawings into panel dimensions, and those dimensions decide how the crate is built and what the container weighs.
Order the custom mesh panel sizes and the shipping term together, so a panel that fits the frame also fits the box. Aperture size and alloy change nothing about the freight, but they change the value you declare to customs.
FAQ
FOB gives the buyer control of freight and insurance, which usually costs less over time and keeps the claim in the buyer’s hands. CIF is simpler to administer because one invoice covers the freight, but risk still passes at the origin port.
The importer of record pays it. Import duty on stainless steel netting depends on the HS code and the destination country, so confirm the classification with a broker before you budget.
Yes under DDP, provided the site can take the vehicle. Narrow service gates, gravel yards and overhead branches all change the delivery plan, so send photographs of the access route with the enquiry.
Photograph the crate before opening, note the damage on the delivery receipt, and notify the carrier and insurer inside the policy window. Under CIF the claim runs on the seller’s policy, which is one more reason to buy your own cover.
Check the cover level first. Shipping insurance for netting order value above a few thousand dollars is worth pricing separately, because CIF cover meets a minimum on clauses C and excludes many perils. Make sure the two policies do not overlap.